Home / Series / The Art Of Boat Building / Aired Order / Season 2 / Episode 5

Lining Off The Hull And Installing Ribbands On The Haven

In this episode Bob installs the ribbands on the Haven 12 1/2. He also explains lining off the hull and builds a jig for cutting scarf joints.

English
  • Originally Aired June 16, 2019
  • Runtime 19 minutes
  • Network YouTube
  • Created September 5, 2020 by
    Administrator admin
  • Modified September 5, 2020 by
    Administrator admin