Home / Series / The Art Of Boat Building / Aired Order / Season 2 / Episode 4

Setting Up Molds And Strongback

In the episode Bob shows and discusses a alternative method of setting up the molds for the Haven 12 1/2. He explains and shows how to design and build a ladderback set up as well as how to design the molds to accept ribbands.

English
  • Originally Aired June 6, 2019
  • Runtime 30 minutes
  • Network YouTube
  • Created September 5, 2020 by
    Administrator admin
  • Modified September 5, 2020 by
    Administrator admin