| Name | First Aired | Runtime | Image | |
|---|---|---|---|---|
| S01E01 | The Model and the Mold | 1 | ||
| S01E02 | The Blocks | 1 | ||
| S01E03 | The Rib Structure Part 1 | 1 | ||
| S01E04 | The Rib Structure Part 2 | 1 | ||
| S01E05 | The Linings | 1 | ||
| S01E06 | Tracing and Cutting Out the Top and the Back | 1 | ||
| S01E07 | Arching the Top and Back | 1 | ||
| S01E08 | The Edgework and Outline | 1 | ||
| S01E09 | The Purfling | 1 | ||
| S01E10 | The Purfling Channel, Scraping the Top and Back | 1 | ||
| S01E11 | Graduating the Top | 1 | ||
| S01E12 | The F-holes | 1 | ||
| S01E13 | The Bass Bar | 1 | ||
| S01E14 | Graduating the Back | 1 | ||
| S01E15 | Block Shaping and Gluing the Back | 1 | ||
| S01E16 | Removing the Mold and Gluing the Top | 1 | ||
| S01E17 | The Scroll Part 1 | 1 | ||
| S01E18 | The Scroll Part 2 | 1 | ||
| S01E19 | The Fingerboard and Neck | 1 | ||
| S01E20 | Setting the Neck | 1 | ||
| S01E21 | Edgework and Final Polish | 1 | ||
| S01E22 | Varnish Part 1 | 1 | ||
| S01E23 | Varnish Part 2 | 1 | ||
| S01E24 | Pegs, Fingerboard, Bridge, and Final Setup | 1 |