Home / Series / Tips From A Shipwright / Aired Order / Season 3 / Episode 9

Building The Transom

We're getting close to springing our 23' V-Bottom skiff together. This week Lou shows us how he built the transom from six layers of 7/16 inch white oak epoxied and vacuumed bagged together.

English
  • Originally Aired August 28, 2020
  • Runtime 18 minutes
  • Network YouTube
  • Created September 28, 2020 by
    Administrator admin
  • Modified September 28, 2020 by
    Administrator admin