Home / Series / Tips From A Shipwright / Aired Order / Season 1 / Episode 10

Preparing For Frames

Lou is back at it building his work skiff in the Open Door Boat-shop. This week Lou cuts down the bottom plank with a saw and then planes it down so it's flush with the chines and transom. He then shows us how he plans to design and attach the frames to the side planking and chines.

English
  • Originally Aired September 1, 2016
  • Runtime 11 minutes
  • Network YouTube
  • Created September 1, 2020 by
    Administrator admin
  • Modified September 1, 2020 by
    Administrator admin