Home / Series / Tips From A Shipwright / Aired Order / Season 1 / Episode 8

How To Install The Chines On A Wooden Boat Work Skiff

Shipwright Louis Sauzedde's work skiff is coming together and starting to look like a boat. In this episode he shows us how he cuts and installs the chines inside the bottom planking. The first step is to make sure the bottom of the planking is flat and then each chine must be measured and fit at both ends before being sawed and then clamped into position.

English
  • Originally Aired August 18, 2016
  • Runtime 7 minutes
  • Network YouTube
  • Created September 1, 2020 by
    Administrator admin
  • Modified September 1, 2020 by
    Administrator admin