Home / Series / This Old House / Aired Order / Season 36 / Episode 16

Lexington Project 2015: Part 8: Conservation Concerns

A covered gutter is installed; the infiltration system to disperse water from gutters into the ground is detailed; native plants that will return part of the lawn back to nature are discussed; and how existing aluminum wiring is being worked with while updating recessed light fixtures and installing sconces over the mantel. Also: the making and testing of two types of windows for the project.

English
  • Originally Aired February 21, 2015
  • Runtime 25 minutes
  • Production Code #3416
  • Network PBS
  • Created February 27, 2015 by
    Administrator admin
  • Modified March 31, 2023 by
    S Mc
Name Type Role
Thomas Draudt Director