Home / Series / This Old House / Aired Order / Season 20 / Episode 25

The Key West House - 6

Just as they're getting used to all the sunshine, the crew realizes it's almost time to wrap up the Key West project. The activity on site is intense. Window installer Charles Malta reviews the options in balancing the traditional sash he's installing - vinyl with springs, tube, tape and good old prop sticks. We see the Italian-made kitchen going on in and admire its style, mechanics and ease of installation. Afterward, the molded urethane window trim is applied in the dining room. In the library, we see the first of the cabinets to arrive from Savannah and then take a tour of an exquisitely restored and furnished Key West ""eyebrow"" house. Back on site, the flooring contractor inlays the river-recovered heart pine floor with a diamond pattern of rare curly pine. With a thunderstorm quickly approaching, we watch v-crimp metal roofing go on the new rear roof. Watch and learn: How to install metal roofing.

English
  • Originally Aired March 13, 1999
  • Runtime 25 minutes
  • Production Code 1825
  • Network PBS
  • Created November 9, 2006 by
    Administrator admin
  • Modified November 9, 2006 by
    Administrator admin