Home / Series / The Art Of Boat Building / Aired Order / Season 2 / Episode 39

Installing Floor, Aft Deck Beams & Locker Floor

In this episode (S2-E39) of The Art of Boat Building the Haven 12 1/2 has it's interior primed readying for bilge paint. Bob Emser, boat builder starts by installing the floor beams followed by the aft deck beams and the aft locker floor. He then begins painting the bilge with TotalBilge by total boat.

English
  • Originally Aired January 23, 2021
  • Runtime 25 minutes
  • Network YouTube
  • Created January 23, 2021 by
    Administrator admin
  • Modified January 23, 2021 by
    Administrator admin