Home / Series / The Art Of Boat Building / Aired Order / Season 2 / Episode 13

Building The Ballast Keel Mold For The Haven

In this episode the ballast keel mold in constructed according to the Haven 12 1/2 plans.

English
  • Originally Aired November 9, 2019
  • Runtime 11 minutes
  • Network YouTube
  • Created September 5, 2020 by
    Administrator admin
  • Modified September 5, 2020 by
    Administrator admin