Home / Series / Super Structures of the World / Aired Order / Season 1 / Episode 2
Home / Series / Super Structures of the World / Absolute Order / Season 1 / Episode 2

Hibernia GBS

The Hibernia platform has three separate components: Topsides, Gravity Base Structure (GBS),Offshore Loading System (OLS). The completed platform was towed to the Hibernia oil field and positioned on the ocean floor in June of 1997 and began producing oil on November 17, 1997. The platform stands 224 meters high, which is half the height of New York's Empire State Building and 33 meters taller than the Calgary Tower.

English
  • Originally Aired January 1, 1998
  • Runtime 45 minutes
  • On Other Sites IMDB
  • Created August 4, 2015 by
    Administrator admin
  • Modified August 10, 2024 by
    TVDB Editor