Home / Series / Rough Cut with Fine Woodworking / Aired Order / Season 7 / Episode 11

Finishing the Front

This week on Rough Cut Woodworking with Tommy Mac we focus on what it takes to really complete the exterior of the shop. First we put in a massive granite block to serve as the front step into the workshop. Then contractor Chris Reynolds works with Tommy to create some window boxes and then finishes the look by filling in the landscaping in front of the shop and lays down the gravel for the driveway.

English
  • Originally Aired December 10, 2016
  • Runtime 30 minutes
  • Content Rating United States of America TV-G
  • Network PBS
  • Created January 28, 2017 by
    Administrator admin
  • Modified January 28, 2017 by
    Administrator admin