Home / Series / Rebuilding Tally Ho / Aired Order / Season 6 / Episode 19

Machining The Driveline & Installing An Unusual Propeller

In this episode we install the Aquadrive thrust bearing (which requires an extremely shiny and strong custom stainless steel bracket), the coupling, the stuffing box, the prop shaft, and the propeller! Our neighbor Dylan help us with lots of machining work as we cut the shaft to length, cut the keyway, face the coupling, and so on.

English
  • Originally Aired September 10, 2022
  • Runtime 25 minutes
  • Created September 10, 2022 by
    BoatFan
  • Modified September 10, 2022 by
    BoatFan