Home / Series / Rebuilding Tally Ho / Aired Order / Season 5 / Episode 16

Lead-Pouring Disaster

In this episode we attempt to slightly enlarge the lead ballast keel by pouring a layer of molten lead on top of it. Before we actually pour I discuss the reasons for doing this and we fabricate a large “pig” to melt the lead in. Unfortunately when we actually pour the molten lead things do not go as planned! ….and now I’m left with a very difficult decision.

English
  • Originally Aired July 4, 2021
  • Runtime 41 minutes
  • Created July 4, 2021 by
    BoatFan
  • Modified July 4, 2021 by
    BoatFan