Home / Series / Rebuilding Tally Ho / Aired Order / Season 3 / Episode 24

Making Beam Shelves

In this episode I start by adjusting the position of some of the frames, and fairing them all on the inside. Then I cut and fit the scarph joins on the big 6-1/2” x 3” Angelique timbers. Along the way, I do a stress test on the 28’ long timbers by parking a vehicle over each end, and jacking up the middle with a 20 ton bottlejack. The chickens and Pancho the parrot lark around as usual.

English
  • Originally Aired December 21, 2019
  • Runtime 28 minutes
  • Network YouTube
  • Notes Is a season finale
  • Created September 1, 2020 by
    Administrator admin
  • Modified September 1, 2020 by
    Administrator admin