Tally Ho is fully re-framed! In this episode we see the final part of the frame-raising party, as we make and install the last of the frames that make up the bow of the boat. We also work on the Fashion Pieces, and take some time to do some local sailing. Finally, a container-full of really long timber arrives from Suriname, and we have to figure out the logistics of moving it around.