Home / Series / Rebuilding Tally Ho / Aired Order / Season 3 / Episode 6

Bolting The Stern Timbers

Before the rest of the volunteers arrive, we have to get the huge timbers of the Stern Assembly bedded and fastened into the stern of Tally Ho. First we drill the holes for the bolts, using a 6’ long drill bit in a custom-made jig. Then we lift all the pieces with jacks and ropes, and fill the gaps with Tar and Felt. When they are back in place, the bronze bolts are driven through and tightened up, and lo and behold – the Stern Assembly is ready to accept new Frames, just in the nick of time! The last weeks have been especially hectic, so this video is a little shorter than usual, and hasn’t covered all the amazing work that Arnaud, Finn, Thom, Kirt and Tim have been doing to prepare for our intensive Frame-raising period, which is just beginning! Next video we will meet all the volunteers, old and new, and start mass-production of the stern frames.

English
  • Originally Aired March 23, 2019
  • Runtime 21 minutes
  • Network YouTube
  • Created September 1, 2020 by
    Administrator admin
  • Modified September 1, 2020 by
    Administrator admin