Home / Series / Rebuilding Tally Ho / Aired Order / Season 8 / Episode 9

Winches On Deck / Woodburner Below

In this episode we start with some tiling around the Woodburner. After lighting the fire, we follow the making of mast wedges, carving in the deck beam, a very fancy engine-room cabinet, and finally the installation of the cockpit winches!

English
  • Originally Aired March 30, 2024
  • Runtime 23 minutes
  • Created March 30, 2024 by
    BoatFan
  • Modified March 30, 2024 by
    BoatFan