Home / Series / Perkins Builder Brothers / Aired Order / Season 2 / Episode 57

Day 60

We do all of the prep work for tiling the shower/tub walls and the floors in the bathrooms. This includes installing backer board and using a waterproofing membrane on the walls. We also get the septic tank installed.

English
  • Originally Aired April 11, 2021
  • Runtime 12 minutes
  • Created July 18, 2021 by
    ShrinkWrapper
  • Modified January 6, 2025 by
    JNW1980