Home / Series / Perkins Builder Brothers / Aired Order / Season 1 / Episode 9

Episode 9

In Episode 9 we finish the last bit of framing, including the wall connecting the first and second floor roofs and the small roof over the master bathtub. For this section we "stick frame" instead of using engineered trusses. There is charts in the code book and on the American Wood Council web site (or app called SpanCalc) that detail allowable spans for different type materials.

English
  • Originally Aired July 19, 2020
  • Runtime 13 minutes
  • Created July 18, 2021 by
    ShrinkWrapper
  • Modified January 6, 2025 by
    JNW1980