This week I'm putting in insulation and damp proofing, with some local help of Julian, Davide and Jordi. The rainy weather is not behind yet, which is a good test for the drainage system. 0:00 Arriving after the rain 2:44 Feeding the chickens 3:37 Insulation around the cabin 4:31 Main water pipe 5:44 Morning 6:06 New espresso maker 8:59 Planting basil 9:24 Water proofing 11:09 Explanation water proofing 12:56 break 13:49 Digging pit for septic system 15:43 Diggin sewage pipe 19:39 Filling up the Trench 23:38 More Flooding 28:12 Closing the trench 29:02 Connecting pipes 34:36 A sunny day 37:45 Outro monologue