Home / Series / I Build NH / Aired Order / Season 1 / Episode 6

Utilities

What do a calculator, tape measure and level with grade rod all have in common? You can't install a sewer main without them! Krista is an assistant director with public works and will be demonstrating proper use of survey equipment to install sewer line on grade and at the right elevation. It takes an experienced team and the right plan!

English
  • Originally Aired September 3, 2021
  • Runtime 17 minutes
  • Network PBS
  • Notes Is the series finale
  • Created March 23, 2024 by
    Zetacon
  • Modified March 23, 2024 by
    Zetacon