Building 6 is being constructed. This is the large building on the back where the switch track and maintenance area is. Because the inside is not accessible to guests I cant' make the interior for this. In next episode last scenery parts and the outer bridge will be placed. I got a lot of questions about when this will be ready and uploaded on the workshop. I'm trying to finalise this coaster within this week. But this is not set in stone. Thank you all for watching!